We prepare the pool for practical completion checks with clean water, recorded startup readings and a clear handover pack. The service covers commissioning, practical defect notes and basic owner instructions, so warranty details are easier to find later.
Use a clean potable source and do not stop filling until water reaches mid-skimmer to reduce the risk of tide lines on new interiors. Record source-water readings before chemical additions.
Startup readings should be easy to read later. The log shows what was measured, what was adjusted and what still needs watching during the first weeks.
| Reading | What to record | Why it matters |
|---|---|---|
| pH | Starting level and each adjustment | Protects new surfaces and affects chlorine performance. |
| TA | Buffer level before acid or alkalinity corrections | Controls pH movement during the first weeks. |
| CH | Calcium hardness and LSI context | Helps reduce aggressive or scale-forming water conditions. |
| CYA / Salt | Stabiliser level and salt timing | Supports routine sanitation once the pool moves out of startup. |
Usually one on-site day plus a follow-up in week one; complex systems may require extra tuning.
No. For new plaster or pebble, wait for the relevant cure period. Use liquid chlorine first, then add salt and enable the cell when appropriate.
Commissioning report, user quickstart, maintenance calendar, warranty records, safety sheet and as-built visuals.
Site supervisor, commissioning technician and owner or property manager should attend where possible so responsibilities and training are clear.
Get the new pool checked, balanced and documented before the owner takes over.
Tap a suburb chip to focus the map. We mainly service Carrum Downs, Frankston, Seaford, Chelsea, Patterson Lakes and nearby south-east suburbs, with selected Mornington Peninsula coverage.